Design – September 2025 – Fall 2026
Bronx River Addition: Scope of Work
The Bronx River Addition modernization will address long-standing building needs while improving safety, comfort, and long-term reliability across the development. All work is part of a comprehensive, building-wide renovation plan.
Ventilation
Upgrades to building ventilation systems to improve airflow, indoor air quality, and overall resident comfort.
Local Law 11 + Full Window Replacement
Full window replacement across buildings to meet Local Law 11 requirements, improve energy efficiency, and enhance safety and comfort inside apartments.
Full Electrification of Heating Systems
Electrification of space heating systems and repairs to existing hot water infrastructure to improve system reliability and performance.
Full Plumbing and Electrical Upgrades
Replacement and modernization of plumbing and electrical systems to support safer, more reliable service throughout apartments and common areas.
Elevator Replacement
Complete replacement of elevators to improve reliability, accessibility, and reduce service disruptions.
Structural Repairs
Targeted structural repairs to address building conditions and ensure long-term safety and durability.
Hazardous Material Abatement
Removal and mitigation of hazardous materials, including lead and asbestos, following all safety regulations and protocols.
Kitchen and Bathroom Renovations
Full kitchen and bathroom renovations in all apartments, including:
Approximately 7% fully accessible apartments
Approximately 4% hearing- and vision-impaired (HVI) units
New fixtures, finishes, and flooring
Property Management Office
Construction of a new on-site property management office to support resident services and day-to-day operations.